project of constructing a farm of Iranian roses & medicinal plants together with the project of constructing a traditional workshop of roses & distillates and the project of constructing an industrial factory of essential oils & rose oil.


The minimum land area for contracting national projects is 50 hectares and for international projects is 100 hectares.

Types of contracts in the manner of an international contract: an international partnership contract, an international consulting contract, an international investment contract, a national contract, a national partnership contract, an international consulting contract, a national investment contract.

Steps of implementing the project of constructing a farm of Iranian roses and medicinal plants along with the project of constructing a traditional workshop of roses and distillates and carrying out a project of constructing an industrial factory of essential oils and rose oil.

First, we will implement the stages of the construction project of the Iranian rose farm:

?Step 1:
Agricultural land leveling.

?Step 2:
Land preparation and soil processing.

? Third step:
Digging and supplying fertilizer for soil.

? Step 4:
The seedlings are purchased and transported to the farm.

? Step 5:
A seasonal worker is hired to plant seedlings.

?Step 6:
Irrigation equipment is installed, deployed to direct water and irrigation.

?Step 7:
A permanent worker is hired to care for the young seedlings.

?Step 8: The product is harvested (after two years)

??????????????????????

After the end of the seedling planting stage, we have one year to reach the initial product, and in the first year after planting, we will carry out the construction project of a traditional rose and distillate workshop.

?Step 1:

  • 3000 meters of land will be allocated for the construction of Garkah.
  • Allocation of 2000 meters of land enclosed by a wall.
  • Allocation of 500 to 1000 meters of indoor building for equipment installation

?Step 2:
The equipment of the conversion industry and special equipment are purchased and the industrial dryer is provided.

?Step 3:
Specialized equipment is installed and special structures are created.

??????????????????????

In the second year after planting, we carry out the project of rose essential oil and oil industrial factory.

?Step 1:

  • 7,000 to 10,000 meters of land will be allocated for the construction of the factory.
  • 4000 to 5000 meters of land is allocated for the indoor factory building.
  • 500 to 1000 meters of indoor building for storage of products

?Step 2:
Industrial equipment and equipment for the production of essential oils and special supplies are purchased and the industrial dryer is provided.

?Step 3:
Industrial equipment is installed and prepared for the production of essential oils and oils of Iranian rose.